Jacking Pipes
There are no excavations in the jacking pipe installation model.Pipes are installed inside a tunnel underground by using special purpose machines (tunnel boring machine – TBM), by jacking method.
Relining Pipes
The relining model also does not require excavation.
In order to renew the old pipelines, new GRP pipes are installed by inserting them inside the existing pipes.
Marine Lug®
Patented special Marine-Lug®, which has been designed by RUSEL BORU engineers, is an underwater pipe mounting system for installing large diameter pipes.It facilitates the assembly of pipes underwater; it keeps the pipes stable until backfilling is completed.
- Lugs located on the steel body
- Rotatable (easy to align lug holes)
- Can be removed after pipe installation
- Mounting capability as well as rapid and easy manufacturing.
- The rapid and easy installation of the newly designed Marine-Lug® system is an important criterion for divers who can stay underwater for a limited period of time.With the Marine-Lug® systems, while the divers quickly complete the installation of the pipes without taking life threatening risks, high productivity is ensured with low costs.